Chillers | Towers |
* 2.4 to 3.0 GPM/ton @ 10F "delta T" | * 85 F Leaving water temperature |
* 12,000 BTU / HR / TON | * 95F Entering Water Temperature |
* 20F - 60F Standard Supply Range | * 78F Wet Bulb |
* Tonnage rating @ 50F supply temperature | * 3 GPM / Ton |
* 85F Water cooled condenser (entering) | * 15,000 BTU / HR / Ton |
* 95F Air cooled condenser (entering) | * Consult Manufacturer for other conditions |
Decrease nominal tonnage by approximately 2% per degree below 50F leaving water temperature.
Increase nominal tonnage by approximately 2% per degree above 50F leaving water temperature.
Elevation must be taken into account when an air cooled chiller is being used. Rule of thumb: Every 2000 ft of elevation above sea level will reduce the condenser effective cooling by 6%, 4000 ft 12%. So in short you need to oversize the condenser to compensate for the loss of density in the higher elevation air. |
Heat Load Sizes
Plastics Industry
Injection Molding | 30# /HR of H.D. Polyethylene ....=(STANDARD) 1 Ton of cooling |
35# /HR of L.D. Polyethylene/ Polypropylene ..= 1 Ton of cooling | |
40# /HR of Nylon.............................................. = 1 Ton of cooling | |
50# /HR of Polystyrene or ABS....................... .= 1 Ton of cooling | |
65# /HR of PVC or Polycarbonate................... = 1 Ton of cooling | |
70# /HR of P.E.T............................................... = 1 Ton of cooling | |
Extrusion | 50# /HR of Polyethylene or Polypropylene...... = 1 Ton of cooling |
75# /HR of Polystyrene.................................... = 1 Ton of cooling | |
80# /HR of PVC................................................. = 1 ton of cooling | |
Blow Molding | 40# /HR of Polyolefins ......................................= 1 Ton of cooling |
Mechanical & Extrusion Equipment
Mechanical | Air compressor (No after cooler) ..............................=.16 Ton of cooling/ Hp |
Air compressor (With after cooler) ..........................= .20 Ton of cooling/ Hp | |
Vacuum Pump......................................................... = .10 Ton of cooling/ Hp | |
Hydraulic Cooling ........ .= .1 Ton /Hp or 1.0 Ton of cooling for every 10 Hp | |
Hot Runner Mold ............................ = 1.0 Ton of cooling/ 10.5 KW of heat | |
Water Pump in Circuit........................................ .... = .2 Ton of cooling/ Hp | |
Feed Throat - 400 Ton up machine.... = 1.0 Ton (.5 Ton if below 400 Ton) | |
Extrusion | Gear box cooling .............................................= 1.0 Ton of cooling/ 100 Hp |
Feed Throat 3" Screw or less ... .= 1.0 Ton of cooling (above 3" = 2.0 Tons) | |
Barrel or Screw Cooling .............= 1 Ton of cooling / inch of screw diameter |